T100 - Residence

  • T100-Residential Building
    T100 - Residence
  • T100-Residential Building
    T100 - Residence
  • T100-Residential Building
    T100 - Residence
  • T100-Residential Building
    T100 - Residence
  • T100-Residential Building
    T100 - Residence
  • T100-Residential Building
    T100 - Residence

The total construction area of the project, which is located in the center of Cekmekoy, being 5 minutes drive away from Sile Road and 10 minutes drive away from TEM HIGHWAY, is 947 m2.

ADRESS: SINAN MAH. SENAY SOKAK NO: 25 CEKMEKOY - ISTANBUL

Technical Specifications

  1. The project was constructed on the basis of the earthquake - resistant static project, featuring reinforced concrete framework and raft foundation system.

  2. The project was constructed in full compliance with the REGULATION REGARDING THE BUILDINGS TO BE CONSTRUCTED IN DISASTER AREAS all applicable TURKISH STANDARDS such as TS 500 and was inspected by YAPI DENETIM.

  3. Even though the said regulation provides for the employment of C20 concrete class, the project was constructed by the employment of C25 concrete class, being beyond the mandatory requirements. The steel class used is S420.

  4. The lift shaft was completely strengthened by reinforced concrete curtain wall and was constructed in the matter that all vibrations are to be absorbed.

  5. The elevator cab for 3 persons as well as the steel hardware and the technical equipment thereof were constructed by the employment of the state – of – the – art technology.

  6. Residential space of the building is 155 m2. The project was constructed in strict compliance with the related building permit and the annexes thereto with 155 m2 ground floor space and 174 m2 normal floor space.

  7. The façade was constructed by the employment of precast and compact laminated materials. The store floors were constructed by the employment of 6 mm thick shatterproof, transparent laminated glass.

  8. The walls were constructed by the employment of high heat and acoustic insulating materials. The insulation was complemented by jacketing (4 cm XPS) on the outer surface of the walls.

  9. The natural gas distribution system and the combi-boiler system projects were separately prepared for each floor and the heating system was resolved to the finest detail for each independent bay.

    The details of independent bays are provided as follows;

  • Door number 1 : Store
  • Door number 2 : Store
  • Door number 3 : Residence (office)
  • Door number 4 : Residence (office)
  • Door number 5 : Residence (office)
  • Door number 6 : Residence (office)
  • Door number 7 : Duplex residence (office)
  • Door number 8 : Duplex residence (office)
Back to projects ›
ÇE